The Opera Residence Receiving Refundable Booking For Loft (L23) And Penthouse (L24)
Huynh Vo
Source File
THE OPERA RESIDENCE_CAMP 7.docx
Overview
The Opera Residence — the final phase of The Metropole Thu Thiem by Sonkimland — is now officially receiving refundable bookings for the Loft (Floor 23) and Penthouse (Floor 24).
The pricing for these premium upper-floor units is:
| Unit Type | Floor | Starting Price |
|---|---|---|
| Loft | Floor 23 | From US$10,000/m² |
| Penthouse | Floor 24 | From US$13,000/m² |
Additional incentives are available for buyers who secure their booking early.
The Metropole Thu Thiem — The Crest, The Galleria, Branded Residence, and The Opera Residence, with Thu Thiem Bridge 2 (Cầu Thủ Thiêm 2) and the Pedestrian Bridge (Cầu Đi Bộ)
The Project
The Opera Residence is positioned at the heart of Thu Thiem — Ho Chi Minh City's new financial district — at Plot 1.14, Zone 1, District 2. The project is the closing chapter of the four-phase Metropole Thu Thiem development, sitting directly across the Saigon River from the existing CBD in District 1.
At that time, Thu Thiem Bridge No. 2 was under construction and the new urban area on the eastern bank was taking visible shape from across the river.
Saigon 13/5/2020 — aerial view of the Saigon River waterfront and Thu Thiem Bridge No. 2 under construction
+84 933 97 21 97 (Zalo/Viber/whatsapp) for more information or schedule a direct consultationLoft and Penthouse Availability
The Loft units occupy Floor 23 and the Penthouses occupy Floor 24 of the Scala tower — the top two residential floors of The Opera Residence. These are the most exclusive units in the entire Metropole Thu Thiem development, priced at a significant premium over the standard floors below:
- Loft (L23): from US$10,000/m²
- Penthouse (L24): from US$13,000/m²
Prospective buyers who had not yet placed a booking were directed to contact the agency first before proceeding.
Saigon 12/5/2020 — aerial view at dusk with the Saigon River, Landmark 81, and Thu Thiem Bridge No. 2 under construction in the foreground
The Metropole Thu Thiem — Four Phases
The full Metropole Thu Thiem development spans four phases along the Thu Thiem waterfront:
| Phase | Name |
|---|---|
| Phase 1 | The Crest Residence |
| Phase 2 | The Galleria Residence |
| Phase 3 | The Opera Residence |
| Phase 4 | Branded Residence |
The Opera Residence is the last residential phase open for public booking, making the Loft and Penthouse units the final opportunity to enter the overall development.
The Metropole Thu Thiem — waterfront development overview: The Crest Residence, The Galleria Residence, Phase 4, and The Opera Residence
More to Read
Related News
Last Chance to Book The Metropole Thu Thiem - Phase 3
Refundable bookings for The Opera Residence - Phase 3 of The Metropole Thu Thiem - stopped being accepted on 15 September 2020 ahead of the official launch on 3 October, with prices from US$4,800/m².
The Opera Residence from US$7,000/m²
The Opera Residence focuses on the Thu Thiem Bridge No. 2 connection, riverfront positioning, pricing from US$7,000/m², and a 30% payment schedule until handover.
The Opera Residence — Official Launch on 3 October, Show Flat Completed, Prices from US$4,800/m²
The Opera Residence Phase 3 at The Metropole Thu Thiem announces its official launch date of 3 October with the show flat now complete and open to visit, and early-bird pricing from US$4,800 per sqm.
The Opera Residence opens Penthouse on Level 24 and Loft on Level 23, booking closes on 04 August 2021
The Opera Residence opened online sales on 31 July 2021 for Penthouse on Level 24 and Loft on Level 23, with payment promotions, 5.6m to 6.2m ceiling heights, and a booking cutoff at 5PM on 04 August 2021.
The Opera Residence Shophouse — Commercial Units at Saigon's Wall Street, Priced from 50 Billion VND
Shophouse units at The Opera Residence in Thu Thiem are listed from 50 to 128 billion VND, located next to the Thu Thiem Opera House site, with only 25% payment required until June 2023, direct access benefits from the Bason Bridge completion on 2 September 2021, and a July 2021 construction progress update.