The Opera Residence opens Penthouse on Level 24 and Loft on Level 23, booking closes on 04 August 2021
Huynh Vo
Overview
The Opera Residence opened sales for two special product lines in the Scala tower: Loft on Level 23 and Penthouse on Level 24. Sales opened on 31/07/2021 for both products, and booking closed at 5PM on 04/08/2021.

Sales Timeline
The key milestones are:
| Date | Detail |
|---|---|
| 27/07 | Deadline for refundable booking before the 31/07 online opening |
| 31/07/2021 | Online opening for Penthouse (Level 24) and Loft (Level 23) |
| 04/08/2021 - 5PM | Stop receiving booking |
| 07/08/2021 | Final opening for 22 Loft units |
This sales phase also came as Thu Thiem Bridge No. 2 was expected to complete by the end of 2021, improving the connection between the existing CBD in District 1 and the Thu Thiem peninsula.
Site plan showing the Scala and Massimo towers of The Opera Residence beside the Thu Thiem Opera House plot
Broader Thu Thiem site context with Central Plaza, the commercial zone, and The Opera Residence position marked
+84 933 97 21 97 (Zalo/Viber/whatsapp) for more information or schedule a direct consultationPenthouse and Loft Details
| Unit Type | Position | Quoted Price | Ceiling Height |
|---|---|---|---|
| Loft | Level 23 | From US$11,000/m² | 5.6m |
| Penthouse | Level 24 | From US$13,000/m² | 6.2m |
Loft living and dining area rendering at The Opera Residence
Upper-floor family lounge rendering in the Loft unit
Penthouse pool-view rendering at The Opera Residence
85 sqm Loft Layout - 3 Bedroom Option
- A lower floor with living, dining, kitchen, one master bedroom, and balcony space.
- An upper floor with a junior master bedroom, bedroom 2, and a family lounge / study area.
Lower level layout of the proposed 85 sqm Loft plan, showing the living, dining, kitchen, and master bedroom arrangement
Upper level layout of the proposed 85 sqm Loft plan, with the junior master bedroom, bedroom 2, and family lounge / study
+84 933 97 21 97 (Zalo/Viber/whatsapp) or email at admin@huynhvo.com for more informationPayment Terms and Discounts
The payment options and discounts were structured around two main groups:
| Program | Detail |
|---|---|
| Standard payment | Immediate 1.5% discount |
| Bank support | TPBank and the developer support principal grace period and 0% interest until handover or the end of 08/2023, whichever comes first |
| 50% payment | 4% discount |
| 70% payment | 7.5% discount |
| 95% payment | 11.5% discount |
The remaining release also focused on 22 Loft units with 5.6m ceiling height, at a quoted price range of US$9,800 - US$13,000 per sqm, excluding VAT.
Booking Cutoff on 04 August
Booking closed at 5PM on 04/08/2021
More to Read
Related News
Last Chance to Book The Metropole Thu Thiem - Phase 3
Refundable bookings for The Opera Residence - Phase 3 of The Metropole Thu Thiem - stopped being accepted on 15 September 2020 ahead of the official launch on 3 October, with prices from US$4,800/m².
The Opera Residence from US$7,000/m²
The Opera Residence focuses on the Thu Thiem Bridge No. 2 connection, riverfront positioning, pricing from US$7,000/m², and a 30% payment schedule until handover.
The Opera Residence — Official Launch on 3 October, Show Flat Completed, Prices from US$4,800/m²
The Opera Residence Phase 3 at The Metropole Thu Thiem announces its official launch date of 3 October with the show flat now complete and open to visit, and early-bird pricing from US$4,800 per sqm.
The Opera Residence Receiving Refundable Booking For Loft (L23) And Penthouse (L24)
The Opera Residence at The Metropole Thu Thiem opens refundable bookings for the Loft on Floor 23 and Penthouse on Floor 24. Loft from US$10,000/m², Penthouse from US$13,000/m². There is no 2nd Thu Thiem in Vietnam.
The Opera Residence Shophouse — Commercial Units at Saigon's Wall Street, Priced from 50 Billion VND
Shophouse units at The Opera Residence in Thu Thiem are listed from 50 to 128 billion VND, located next to the Thu Thiem Opera House site, with only 25% payment required until June 2023, direct access benefits from the Bason Bridge completion on 2 September 2021, and a July 2021 construction progress update.