Thu Thiem Zeit River Construction Progress Update
Huynh Vo
Project Snapshot
VGSI, a subsidiary of GS E&C, is the developer. The project sheets list GS E&C's completed works in Vietnam as Zeitgeist, Long Binh District 9, Xi Riverview Thao Dien, Metro Line No.1, Pham Van Dong Street, and Binh Loi Bridge.
The layout is described as low-density, with 18.5% construction density, 4-6 units per floor, 3 guest lifts, 1 service lift, 2 basements, and 470 car parking lots. The parking ratio is 1.5:1.
Progress Snapshot
Thu Thiem Zeit River is positioned in Function Area 3 at the corner of Crescent Boulevard and Nguyen Co Thach in Thu Thiem, with the first phase on Lot 3-11. The project covers 9,125.8 sqm of land and is planned around 300 units across two towers: T1 at 25 floors and T2 at 32 floors.
The progress update shows the project moving from a completed base foundation to Level 23 work.
Level 5
Level 23
+84 933 97 21 97 (Zalo/Viber/whatsapp) for more information or schedule a direct consultationUnit Mix and Parking
| Unit Type | Size | Note |
|---|---|---|
| 1BR | 60.62 sqm | Only available in T2 |
| 2BR | 90.55 - 97.17 sqm | |
| 3BR | 125.8 sqm | |
| 4BR | 181.1 sqm | |
| 4BR Duplex | 215.81 sqm | |
| Penthouse | 392.45 sqm | Not available |
With a smart parking setup with number plate identification at the lot entrance, a command center for parking-lot monitoring, and home-network system integration.
Typical floor plate with the core and apartment mix around the tower center
Smart parking solution overview with number plate identification, command-center monitoring, and barrier control
+84 933 97 21 97 (Zalo/Viber/whatsapp) or email at admin@huynhvo.com for more informationLifestyle Renderings
Unique living standard - interior render with a double-height living room and skyline view
The destination of the elite with high-class living experiences - rooftop pool and skyline view
Street-facing podium and tower frontage at dusk